Get the Flash Player to see this player.
English Croatian Czech Danish Dutch French German Italian Polish Romanian Spanish

choppa-droppa-step-by-step

 

ready-tied-choppa-droppa-leader-step-1

Step 1

Ready Tied Choppa Droppa Leader.

take-off-micro-bead-step-2

Step 2

Take off micro bead, add lead to link,replace bead.

by-attaching-the-loop-step-3

Step 3

By attaching the loop to the swivel you are able to cast(without losing the lead) to find suitable feature.

once-you-have-found-a-feature-step-4

Step 4

Once you have found a feature either clip up or tie a marker to main line, take link loop off swivel and replace with your rig.

pull-loop-through-the-hole-step-5

Step 5

Pull loop through the hole in clip (there is no lead in this link).

pinch-a-small-sliver-step-6

Step 6

Pinch a small sliver off a soluble nugget ,roll in fingers and place in loop.

once-the-rig-has-been-step-7

Step 7

once the rig has been cast the nugget will melt, allowing the link, if snagged to come back through the hole, all the pressure is then applied to the lead and micro bead, which will fall off, allowing the fish to be safely landed.

rig-ready-to-cast-step-8

Step 8

Rig ready to cast.

 
Copyright © 2009 www.atomictackle.co.uk all rights reserved.
Joomla Templates by Joomlashack